background image
GigaX Series L2 Managed Switch User’s Guide
66
5.1
Power On Self Test
POST is executing during the system booting time. It tests system memory,
LED and hardware chips on the switchboard. It displays system information as
the result of system test and initialization. You can ignore the information until
the prompt, “(ASUS) %”, appears (see Figure 42).
Figure 42. CLI interface