background image
Chapter 3: Installation option
Chapter 3: Installation option
Chapter 3: Installation option
Chapter 3: Installation option
Chapter 3: Installation option
3-2
3-2
3-2
3-2
3-2
The items required for the optional configurations described in this
chapter are not included in the standard barebone system package.
These items are purchased separately.
Preparing the system for rack mounting
Removing the footpads or roller wheels
Removing the footpads or roller wheels
Removing the footpads or roller wheels
Removing the footpads or roller wheels
Removing the footpads or roller wheels
Refer to section “2.10.6 Chassis footpads and roller wheels” for
instructions on removing the footpads or roller wheels.
Removing the top cover
Removing the top cover
Removing the top cover
Removing the top cover
Removing the top cover
To remove the top cover:
1.
Remove the chassis cover. Refer to section “2.1.1 Removing the side
cover.”
2.
Remove the front panel assembly. Refer to section “2.5.1 Removing
the front panel assembly.
3.
Carefully slide out protruding
portion of the top cover as
shown.
Attaching the rack rails
Attaching the rack rails
Attaching the rack rails
Attaching the rack rails
Attaching the rack rails
Refer to the installation guide that came with the Rackmount Rail Kit for
instructions on how to attach the rails and on the barebone server system
and the corresponding rails on the industrial rack.
4.
Locate two round mylars on top
cover.
5.
Carefully remove each mylar
using a sharp, flat object such
as the edge of a cutter.